Transforming Environments with Cutting-Edge Water Treatment Solutions
Our Projects
Water Treatment - Multiple Systems
Ghanada Palace, Abu Dhabi, UAE
UV Sterilizers
Cartridge Filters
Sand Filter
Iron Removal
Filter
Carbon Filter
Water Treatment Lake
Burj Khalifa
Water Bird has been maintaining the quality
of Lake/Fountain water for many years to the
highest quality by providing treatment
chemicals and customised dosing
equipment’s and technical support.
Client: EMAAR
Location: Dubai Fountain
Cooling Tower Systems
Jewel of the Creek is a 1 million sqm mixed use development in the Port Saeed area of Deira occupying a strategic location at the north shore of Dubai Creek. The project incorporates mix of residential, commercial, hospitality and recreational use and will transform this location to a vibrant urban centre and the prominent landmark in the heart of Dubai.
- No of Circuits :2 Nos
- System-1
- System Capacity / recirculation rate: 21000USGPM
- System Volume : 800M3
- System-2
- System Capacity / recirculation rate: 16000USGPM
- System Volume : 300M3
- No of Circuits :16 Nos
- System Volume : 2500M3
Project : JEWEL OF THE CREEK, DUBAI, UAE
Client: Dubai International Real Estate (DIRE)
Location: Deira, Dubai, UAE
Automatic Dosing System
19 Nos. automatic dosing systems for swimming pools
4 Nos. Automatic dosing system for Potable water.
4 Nos. Automatic dosing system for Condenser water.
2 Nos. Automatic water softeners – 28 m3/Hr
Automatic Dosing System
5 Nos. Chlorine Dioxide Plants for Potable water Disinfection
6 Nos. Automatic dosing system for Swimming pools
Water Treatment
Recreational Lake Water Treatment – Containerised Chlorine/pH/Algaecide Dosing system – 2 sets – For lake treatment and algal control
Project: Al Forsan International Resort
Swimming Pool Dosing System
Swimmming Pool Dosing System
Cooling Tower Dosing system
STP Plant-Dewa
Pre Fabricated Process Tank
RCC Process Tank
Commant of Militry Works (CMW)
5 Nos. of Vehicle Wash Recovery Systems (400 to 500LPM)
4 Nos. Sewage Lifting stations.
2 Nos. of Neutralization systems.
ADCO/ADNOC
- STP for ADCO at SHAH 400m3/day (Extended Aeration)
- STP for ADCOP at IPS & MPS 2 x 50m3/day (MBR)
- STP for ADCO at QUSHAWIRA for 500m3/day,168m3/day, 150 m3/day 80 m3/day & 20 m3/day (EA)
- Lifting station Equipments for ADCOP at IPS, MPS & MOT
- STP for ADNOC at Ruwais 100m3/day (SAFF)
GASCO
- STP for GASCO 20m3/day at HABSAHAN
- STP for GASCO 750 m3/day at HABSHAN